skip navigation

About Cairn

We are Cairn Energy, one of Europe's largest independent oil and gas exploration and production companies. We are listed on the London Stock Exchange and based in Edinburgh. Our business is divided into two key units: one focused on developing the Rajasthan resource base; the other exploring frontier basins in Greenland.

Cairn India

Rajasthan

  • Development area – Oil and gas production
  • Exploration and development

Lakshmi

Gauri

  • Oil and gas production

Eastern India

  • Onshore and offshore exploration acreage

Western India

  • Onshore and offshore exploration acreage

Ravva

  • Oil and gas production

Sri Lanka

  • Offshore exploration acreage

Cairn Energy

Greenland

  • Offshore exploration acreage

Edinburgh

Albania

  • Offshore exploration acreage

Tunisia

  • Offshore exploration acreage
  • Office in Tunis

Nepal

  • Onshore exploration acreage
  • Office in Kathmandu

Bangladesh

  • Offshore gas production processed at the Sangu processing plant near Chittagong
  • Offshore and onshore exploration
  • Office in Dhaka

Cairn holds a 62.39% interest in Cairn India, which is a listed subsidiary of Cairn quoted on both the Bombay Stock Exchange and the National Stock Exchange of India. Cairn India has interests in a number of blocks in India and Sri Lanka, which includes significant production capabilities being developed in Rajasthan.

Outside of India, our core exploration assets are in Greenland, where we have established a material position. We also have material operated interests in Albania, Bangladesh, Nepal and Tunisia.

A summary of the principal licence interests is provided in the 2009 Annual Report & Accounts.

Operations Lifecycle: How we Manage our CR Impacts

  Seismic Acquisition Exploration Drilling Development Production
Maintain good relations with local communities Yes Yes Yes Yes
Work with contractors to meet health and safety, environmental and social standards Yes Yes Yes Yes
Comply with applicable law, rules and regulations Yes Yes Yes Yes
Proper disposal of waste Yes Yes Yes Yes
Minimise potential of spills Yes Yes Yes Yes
Seek to minimise emissions and other effluents   Yes Yes Yes
Conduct ESIAs Yes Yes Yes Yes
Implement Environmental and Social Management Plans Yes Yes Yes Yes
Community and Social Investment Plans Yes Yes Yes Yes

Cairn explores for oil and gas, constructs facilities to extract discovered oil and gas and sells produced oil and gas to local transmission networks, refineries and other industries. Cairn does not refine oil or sell petroleum products.

Activity Data

Cairn India

  2006 2007 2008 2009
2D seismic (km) 0 645 4,150 525.6
3D seismic (km2) 540 351 255 1,126
Wells drilled (number) 20 22 7 54
Metres drilled 29,919 39,728 1,287 84,078
Total hydrocarbon produced (thousand tonnes) 4,225 3,509 3,174 2,892
Staff in country       1,035

Cairn Energy (excluding Cairn India)

  2006 2007 2008 2009
2D seismic (km) 401 0 10,405 7,911
3D seismic (km2) 0 0 0 407
Wells drilled (number) 0 3 1 0
Metres drilled 0 12,163 3,850 0
Total hydrocarbon produced (thousand tonnes) 1,172 731 461 419

Of which...

Greenland 2006 2007 2008 2009
2D seismic (km) - - 10,405 7,911
3D seismic (km2) - - 0 0
Wells drilled (number) - - 0 0
Metres drilled - - 0 0
Total hydrocarbon produced (thousand tonnes) - - 0 0
Staff in country       0
Albania 2006 2007 2008 2009
2D seismic (km) - - 0 0
3D seismic (km2) - - 0 407
Wells drilled (number) - - 0 0
Metres drilled - - 0 0
Total hydrocarbon produced (thousand tonnes) - - 0 0
Staff in country       0
Tunisia 2006 2007 2008 2009
2D seismic (km) - - 0 0
3D seismic (km2) - - 0 0
Wells drilled (number) - - 0 0*
Metres drilled - - 0 0*
Total hydrocarbon produced (thousand tonnes) - - 0 0
Staff in country       5

*A seabed geotechnical borehole survey was drilled to 12.8 metres.

Bangladesh 2006 2007 2008 2009
2D seismic (km) 401 0 0 0
3D seismic (km2) 0 0 0 0
Wells drilled (number) 0 3 1 0
Metres drilled 0 12,163 3,850 0
Total hydrocarbon produced (thousand tonnes) 1,172 731 461 419
Staff in country       66
Nepal* 2006 2007 2008 2009
2D seismic (km) 0 0 0 0
3D seismic (km2) 0 0 0 0
Wells drilled (number) 0 0 0 0
Metres drilled 0 0 0 0
Total hydrocarbon produced (thousand tonnes) 0 0 0 0
Staff in country       7

* Nepal was in Force Majeure throughout 2009.